Wastewater Treatment

Squamish Wastewater Treatment Plant Upgrades

The District of Squamish is undertaking an extensive upgrade of the Mamquam Wastewater Treatment Plant. The WWTP upgrades consist of construction of a new circular bioreactor/clarifier tank, associated piping and a new septage receiving station. Ground under the proposed circular tank has been excavated to approx.1.5m below grade. Impacted utilities under the proposed circular footprint […]

Squamish Wastewater Treatment Plant Upgrades Read More »

Lulu Island Wastewater Treatment Plant Pilot Digestion Optimization Facility

As Prime Contractor for this project, Tritech is responsible for the supply, fabrication, installation, testing and commissioning of an anaerobic digester pilot facility consisting of four skids containing tanks, pumps, heating equipment, piping, instrumentations, controls, panels, and all ancillaries at the Lulu Island Wastewater Treatment Plant in Richmond, British Columbia. Project valued at $5 million.

Lulu Island Wastewater Treatment Plant Pilot Digestion Optimization Facility Read More »

JAMES Plant UV Treatment Project

Tritech was General Contractor on this project. The work included earthwork, structural work, mechanical work, electrical work, instrumentation and control work. Tritech’s scope of work for this project included: Phase 1 Work Item 1: Effluent UV Disinfection System Modification of existing JAMES Plant disinfection channel for UV system installation. The channel modifications were completed while

JAMES Plant UV Treatment Project Read More »

Annacis Island WWTP Secondary Clarifier

As Prime Contractor for this current and ongoing project, Tritech is responsible for the construction of two multi-stage odour control facilities that will provide odour control for Metro Vancouver’s South Surrey Interceptor. As the Prime Contractor, Tritech’s scope of work included: Biotrickling filter/biofilter vessels, mist eliminators, carbon scrubbers, foul air fans, neutralization tank, nutrient tank,

Annacis Island WWTP Secondary Clarifier Read More »

Chilliwack WWTP Inlet Works and Emergency Repair Works to Primary Clarifiers

Tritech was the design-builder responsible for the design, construction, and commissioning of this Project. Tritech’s scope of work for this project included: Construction of a new Inlet Works Building to house the equipment required for fine screening, screenings washing/compacting, grit and septage separation and transfer pumping Efficient and high-performance screening units with screenings processing A

Chilliwack WWTP Inlet Works and Emergency Repair Works to Primary Clarifiers Read More »

Ahousaht Wastewater Treatment and Marine Outfall Project

Ahousaht First Nation is located on Flores Island (25 min water taxi from Tofino). Tritech was General Contractor for the construction of the new Ahousaht Wastewater Treatment Plant, Pump Station, Forcemain, Marine Outfall and ancillary systems. Tritech’s scope of work for this project included: The supply and installation of all equipment, instrumentation, and electrical systems

Ahousaht Wastewater Treatment and Marine Outfall Project Read More »

Iona Island Wastewater Treatment Plant – Grit Tower Replacement

This project involved the construction of a new concrete grit tower for the Iona Island wastewater treatment plant in Richmond, B.C. Tritech used its expertise as a water infrastructure specialist to complete the structural, electrical and mechanical aspects of the job. Tritech’s scope of work for this project included: The construction of a new concrete

Iona Island Wastewater Treatment Plant – Grit Tower Replacement Read More »

Canmore Wastewater Treatment Plant BAF Expansion

This project involved the construction of a Biological Aerated Filtration (BAF) System for the wastewater treatment plant in Canmore, Alberta. Tritech installed a number of interconnected components to create the system and we were also responsible for start-up, testing and commissioning after installation. To allow the plant to continue to function during construction, Tritech implemented

Canmore Wastewater Treatment Plant BAF Expansion Read More »

Scroll to Top