The work includes the supply of all labour, materials and equipment (excluding equipment identified as owner supplied in the Tender Documents) to construct the secondary treatment units as part of the Phase 3 upgrade of the Ladysmith WWTP. The work includes, but is not limited to, the earthworks, concrete works, structural, mechanical and electrical systems necessary for the complete upgrade as detailed on the Drawings.
The scope of work included: