This project involved the design-build of a water treatment plant and a wastewater treatment plant for the Nordic Competition Venue in Whistler, BC.
VANOC Water and Wastewater Treatment Plant
Owner
VANOC
Project Completion
2008
Project Description
- The design and construction of a valve chamber and reservoir piping for snowmaking, the installation of electrical and monitor systems, and the creation of all ancillary components to complete water supply and treatment systems.
- The design of key components including: a raw water intake and pumping station, chemical dosing, immersed UF membrane filters, disinfection/treated water chlorination, and clear well and high lift pump station.
- Ancillary systems to support the operation of the entire water system, which included a treatment plant building (with separate electrical, chemical storage, laboratory and main process rooms), electrical monitoring and control systems, standby power, a residuals pump station (waste line to WWTP by others), coordination with snowmaking systems operations, and a communications link.