This project involved the construction of an upgrade to a pump station on the Bow River for the University of Calgary. Tritech was responsible for replacing the mechanical and electrical apparatuses that had exceeded their service life and could no longer keep up with capacity. The primary purpose of the Pump Station was to supply untreated river water for air conditioning.
Tritech was required to maintain full operational capacity of the facilities during the construction of upgrades to the original pump station. This was essential to ensure minimal disruptions to the cooling/HVAC services as required by the owner. We also used special noise attenuation procedures due to the site’s location in a high density residential area to minimize disruption to the public and ensure the owner’s satisfaction.