Pump Stations

Oxford Reservoir and Pumphouse

Tritech completed the construction of a 2 MLD (1730 cubic meter) reservoir and associated pump house and chlorination system as part of a water system upgrade for the City of White Rock. Project valued at $3.6 Million. Challenges / Value Added The City of White Rock placed great importance on preserving large fir trees at

Oxford Reservoir and Pumphouse Read More »

Burrard Pump Station Refurbishment

Tritech is the prime contractor for the refurbishment of the Burrard Pump Station, including the Kent & Kinross Pump Station. The work site is located under the West Cordova Street Viaduct in Vancouver, BC. The existing BPS was constructed in 1984, and requires significant upgrading, including structural, mechanical, piping, ventilation, and electrical work. The station

Burrard Pump Station Refurbishment Read More »

Harbour and Kent Pump Stations Gensets

Tritech is a Prime Contractor for the Construction, Installation, and Commissioning of two (2) Owner Pre-purchased Standby Diesel Generators each in a walk-in custom manufactured enclosure complete with sub-base diesel fuel tank at the Harbour and Kent Pump Stations. Tritech’s scope of work for this project included: Harbour Pump Station (combined sanitary & storm WW

Harbour and Kent Pump Stations Gensets Read More »

Construction, Installation and Commissioning Columbia Pump Station Genset

The Columbia Pump Station is a combined wastewater pumping station comprising of both sanitary and storm wastewater systems. As general contractor, Tritech was responsible for providing a fully functional standby power system to the existing Columbia Pump Station in Vancouver. Installation of pre-purchased equipment: Standby diesel generator (500 kW) with sub-base diesel fuel tank into

Construction, Installation and Commissioning Columbia Pump Station Genset Read More »

Ridley Island Pump Station

This Design-Build project was to supply a new pump station to supply domestic and fire flows to Prince Rupert Port Authority clients on Ridley Island. The station replaces an existing aging pump station on the same property. Tritech completed the majority of the engineering work in house including all process mechanical, electrical and controls with

Ridley Island Pump Station Read More »

Bow River Pump Station Upgrade

This project involved the construction of an upgrade to a pump station on the Bow River for the University of Calgary. Tritech was responsible for replacing the mechanical and electrical apparatuses that had exceeded their service life and could no longer keep up with capacity. The primary purpose of the Pump Station was to supply

Bow River Pump Station Upgrade Read More »

Upland Aspen Reservoir and Pump Station

This project involved the construction of a pump station and reservoir for the Town of Innisfail, Alberta. As general contractor, Tritech was responsible for the supply and installation of a 6,800 cubic meter cast in place concrete water reservoir, pump-house superstructure, process mechanical, building mechanical, electrical, instrumentation and controls, site facilities, and water main tie-ins.

Upland Aspen Reservoir and Pump Station Read More »

Old Yale Pump Station Upgrade

This project involved the upgrade of a booster station in Abbotsford, BC. Tritech’s scope of work for this project included: 6m x 8m pump station building expansions Two 200 HP VTP pumps and motors Suction and discharge piping Flow meter chamber Hydro pad mount transformer 750 KW standby generator MCC cabinet and ASD Drives SCADA

Old Yale Pump Station Upgrade Read More »

Scroll to Top