The Columbia Pump Station is a combined wastewater pumping station comprising of both sanitary and storm wastewater systems. As general contractor, Tritech was responsible for providing a fully functional standby power system to the existing Columbia Pump Station in Vancouver.
Installation of pre-purchased equipment:
Standby diesel generator (500 kW) with sub-base diesel fuel tank into an existing genset room in the pump station
3-way manual transfer switch
Genset remote radiator in custom enclosure located on the roof
Auxiliary diesel fuel cooler and charge air cooler to be mounted adjacent to the genset
Supply and installation of miscellaneous equipment:
Fuel storage tank, fuel transfer pumps, fuel access enclosure for fuel delivery and associated instrumentation and controls.
HVAC modifications including Harmonic Filter, supply air fan, exhaust fan, wetwell supply, air fan, and ducting between the Plenum and Genset rooms.
All piping, valves, and mechanical equipment.
Provide Sound Absorbing Insulation in Generator Room.
Steel support system fabrication, grip-span metal flooring and removal guardrail for the new platform in genset room.
Addition of Acoustic Glazing on Inside Storm Windows.
Replacement of Existing Door with New Acoustic Door.
New Fuel Access Enclosure and New Electrical Cable Access Panel.