Status: Completed
Maple Ridge 263 Street Reservoir Expansion
Summary
Tritech is the prime contractor for the demolition of the existing concrete reservoir and construction of two new glass fused steel reservoirs in the same property located in Maple Ridge.The new glass fused steel reservoirs were constructed adjacent to the existing 263 Street Pump Station and concrete reservoir.

Tagged: Other
Client: City of Maple Ridge
Completed Date: August 2024
Type: Design-Bid-Build
The work generally consists of, but is not limited to:
- Concrete demolition of the existing reservoir, pump station and altitude valve chamber.
- Supply and installation of two new 3,000m³, bolted glass-fused-to-steel tanks, two new chambers for the altitude valves and flowmeters.
- On-site drainage, road improvements, new fencing, new ditch work to accommodate the new reservoirs
- Integration of new reservoirs with existing 263rd Pump Station facility and de-commissioning of old concrete reservoir and it’s supporting infrastructure.
- Site security cameras and programming.
- Start-up, testing and commissioning of all new and relocated equipment.