Chilliwack WWTP Inlet Works and Emergency Repair Works to Primary Clarifiers

Summary

Tritech was the design-builder responsible for the design, construction, and commissioning of this Project.
Chilliwack WWTP Inlet Works and Emergency Repair Works to Primary Clarifiers
Status: Completed
Updated: April 16th 2025

Owner: City of Chilliwack
Project Completion: Dec 2021

Tritech’s scope of work for this project included:

  • Construction of a new Inlet Works Building to house the equipment required for fine screening, screenings washing/compacting, grit and septage separation and transfer pumping
  • Efficient and high-performance screening units with screenings processing
  • A high-performance induced vortex grit removal system with grit processing
  • Septage system
  • Pump station supply and installation
  • Construction of a pipeline to convey screened / de-gritted wastewater from the Inlet Works Facility to the existing primary clarifiers
  • Associated geotechnical, civil, structural, architectural, mechanical, electrical & instrumentation

Emergency Repair Works to Primary Clarifiers:
During the upgrade works, a trough collapsed in Primary Tank #1 requiring an emergency repair (unrelated to Tritech’s work). The City retained Tritech to complete emergency repairs as follows:

Phase 1 The Isolation Process:
Prior to completing the proposed repair work, Tritech was required to obtain WCB approval for their method of isolating the discharge channel with an engineered bulkhead gate and sandbags.

Phase 1 work included the following:

  • Obtain WCB approval for the proposed isolation method
  • Conduct sampling of the existing concrete to determine the extent of the concrete repairs
  • Demolition of the existing trough

Phase 2 The Concrete Repair:
Phase 2 included the concrete repair, fabrication, and installation of the channels and troughs in primary tanks #1, #2 and #3. To complete the proposed repair work, Tritech executed the WCB approved method as submitted on Phase 1.