Status: Completed
Annacis Island WWTP Secondary Clarifier
Summary
As Prime Contractor for this current and ongoing project, Tritech is responsible for the construction of two multi-stage odour control facilities that will provide odour control for Metro Vancouver’s South Surrey Interceptor.
Tagged: Wastewater Treatment
Owner: Metro Vancouver
Project Completion: March 2021
As the Prime Contractor, Tritech’s scope of work included:
- Biotrickling filter/biofilter vessels, mist eliminators, carbon scrubbers, foul air fans, neutralization tank, nutrient tank, and ancillary mechanical, electrical, instrumentation and controls equipment
- All mechanical components for both facilities including pumping equipment, process piping and valves, flow measurement, and plumbing systems
- Electrical, instrumentation and control systems including electrical kiosk, MCC, BCH incoming equipment, facility area control panel, heat tracing, lighting, and instruments
- Programming control of the odour control system using a new PLC control system for each facility
- All auxiliary equipment, structures, and sitework including drains, sewers, watermains and systems required to complete the work for both facilities
- Testing and commissioning of the new equipment and auxiliaries
- Coordination with the City of Surrey and the City of Delta for tie-ins to City services and construction within public rights-of-way
- Equipment and operating training to the Corporation’s personnel
- Grading and Landscaping and the construction of gravel driveways and facility platforms