Tritech acted as design-builder for the design and construction of a new Booster Station (Booster Station #13-1) to four developments (a total of 173 lots) in the Eastern Hillsides of Chilliwack.
Tritech acted as design-builder for the design and construction of a new Booster Station (Booster Station #13-1) that was required to boost pressure and provide required fire flow from an existing reservoir to a new pressurized water service to four developments (a total of 173 lots) in the Eastern Hillsides of Chilliwack.
Tritech’s scope of work for the Booster Station 13-1 included: